The following actions can be prevented/controlled with Required conditions.
Case Issuance
Certificate of Occupancy Document Generation
Scheduling of inspections labeled as “Final” (e.g. Final Inspection)
The following actions can be prevented/controlled with Required conditions.
Case Issuance
Certificate of Occupancy Document Generation
Scheduling of inspections labeled as “Final” (e.g. Final Inspection)